Bkksitedotcom1H.jpg (19067 bytes)                   
             TESTING A 525 VA UPS

                       Powercom UPS King Pro 525 VA


   

UPS2.jpg (59091 bytes)
                          

Test Results
1. When all devices of Computer Systems 1 and 2 are turned on
the load level on the UPS is 75%, and it can swing up to about 80%
when the peripherals are operating and the input current to UPs is
approximately 1.22 A.

2. If the 15" monitor of Computer System 2 is turned off the load
level reduced to 47%.

3. If only Computer System 1 is used the load level is 25-30%
and the input current to UPS is approximately 0.57 A.

4. If the computer system is operating and power failure occurred
the UPS will provide power back-up for the period set in System
Configuration, e.g. 300 sec**. Then the command will be sent to
shut down the computer. Event records are also available.

         UPS2C.jpg (29731 bytes)
         UPS2D.jpg (27647 bytes)
Note : ** The total back-up time according to the spec. data is
                 10-30 minutes (depending on computer load).

System Connection    
Two computer systems are connected
to the Powercom UPS King Pro 525 VA
capacity as follows :
Computer System 1
1. CPU Pentium 4, 2.0 GHz.
2. LCD 17" Sony Monitor
3. ZIP Drive
4. External HDD, 80 GB, USB 2.0
5. Card Reader, USB 2.0
6. 4-Way Hub, USB 2.0
7. Super Digibin Portable HDD
Computer System 2
1. CPU Pentium 2,
2. 15" Sony Monitor
3. ZIP Drive

Other Devices Not Connected
Through the UPS

1. Scanner
2. Ink Jet Printer
3. Sound Amplifier

System Configuration Setting
With the UPSMON Power Management
Software the system configuration can
be set.
UPS2H.jpg (38833 bytes)

Note :
The UPS has voltage regulating function
which is useful for the area where there
are frequent lightning, thunderstorm, and
voltage fluctuations.

Hit Counter
Since :June 7, 2003