Suvarnabhumi Airport Rail Link (In Operation)
Elevated Electric Train to Bangkok or the Airport Rail Link (Picture while it was under construction)


       The high speed rail link is from the City Airport Terminal at Makkasan to Suvarnabhumi airport
       which is 28.6 kms long. The construction started in July 2005 andscheduled for completion in
       November 2007. The train will have limited stops at Phaya Thai and Phetchaburi stations. The
       travelling time from Makkasan to Suvarnabhumi airport is about 15 minutes.

Hit Counter
Since : August 5, 2006